Powered By Kitlog Pro v2.0
Norris's RV Construction
RV10
All
3-4-2021
< Previous Log Entry
Next Log Entry >
Date:
3-4-2021
Number of Hours:
2.00
Manual Reference:
Brief Description:
Riveted the two halfs of the deice channel
Riveterd parts joined with tank sealer
Tank side of channel with connecting short channel sealed and rivited
Actuator side of channel after riviting and sealing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
649
3556
10 Avionics
51
293
10 DeIce
58
310
10 Empennage
58
239
10 Engine
8
39
10 Finish Kit
6
24
10 Firewall Forward
82
446
10 Fuselage
180
977
10 Inspection
3
8
10 Interior
22
128
10 Miscellaneous
23
116
10 Paint
35
175
10 Rear Fuselage
27
104
10 Wings
95
527
De Ice
1
170
RV14a Home
Copyright © 2001-2024 Matronics. All Rights Reserved.