KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  7-17-2007
Number of Hours:  4.50
Manual Reference:  Sec Ram-3
Brief Description:  Sec Ram-3

Last night I sanded all of the interior portions of the cowl modification. Cutting away the excess materila left over from the replacement fairing and beveling the areas of the cowl where the paralam is/was. then I mixed some flox and trowled it into all of the seams.voids/intersections and let it cure overnight. This am I sanded the flox so that I could apply the interior lay-ups. That done, I applied 4 plys of 6 oz colth to the interior of the cowl, using the same crisscross approach as before. Put some peel ply on the edges and then left it to cure. Turned the cowl over and put my attention to the exterior. First sanding the fiberglass seams where it meets with the orig cowl to a smooth transition. Then gave the whole exterior a sanding , uncovered some voids and leveled any hogh spots. then mixed several batched of SuperFil and trowled it on. It's pretty hot today (110) so it should set up to pretty stiff in a couple of hours. We're going to a movie and when I get back I'll spread on another coat os SuperFil to let it cure overnight so tomorrow, I can sand the exterior to final shape and possible shoot some primer on it.
' style=

Flox filled interior joints aftre sanding/beveling

Flox filled interior joints aftre sanding/beveling

' style=

4 additional plys applied to interior

4 additional plys applied to interior

' style=

Sanded exterior and applied 1st coat of SuperFil

Sanded exterior and applied 1st coat of SuperFil

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.