KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
Work Logs Found: 35
Category Work Time: 145 Hours
 Date
Hours
Work Log Summary

Details

 11-09-2007
5.25
Sec Panel-41
Details
       

 11-08-2007
5.00
Sec Panel-40
Details
       

 11-06-2007
4.00
Sec Panel-39
Details
       

 11-01-2007
2.25
Sec Panel-38
Details
       

 10-31-2007
5.50
Sec Panel-37
Details
       

 10-30-2007
4.25
Sec Panel-36
Details
       

 08-04-2007
5.00
Sec Panel-35
Details
       

 07-30-2007
5.50
Sec Panel-34
Details
       

 07-11-2007
4.25
Sec Panel-33
Details
       

 07-09-2007
3.50
Sec Panel-32
Details
       

 07-07-2007
5.50
Sec Panel-31
Details
       

 06-21-2007
7.50
Sec Panel-30
Details
       

 05-21-2007
5.50
Sec Panel-29
Details
       

 09-27-2006
1.50
Complete check out of panel components
Details
       

 09-25-2006
4.50
Install dimmer switches and circuits. Continue on
Details
       

 09-23-2006
3.00
Re-work and plan & test dimmer circuits
Details
       

 09-22-2006
4.00
Rebuilt 1/2 of Audio Panel harness
Details
       

 09-21-2006
2.25
Fix EIU interface and add Crosstalk interface
Details
     

 09-20-2006
2.25
checked out panel for functionality
Details
       

 09-19-2006
3.00
initial power-up and configuration of EFIS
Details
       

 09-18-2006
3.25
Finished up the RS 232 connections to the EFIS & M
Details
       

 09-16-2006
3.50
Switch and light power wiring
Details
       

 09-15-2006
3.75
EIU& Autopilot wired to EFIS
Details
       

 09-14-2006
4.50
Headset & Mic plugs
Details
       

 09-13-2006
5.00
Autopilot harness and power distribution
Details
       

 09-12-2006
0.50
Affix the autopilot & switches to center console
Details
       

 09-09-2006
5.75
Mount auto pilot more switches and trim indicators
Details
       

 09-08-2006
5.50
Lighted rocker switches & Flap switch
Details
       

 09-06-2006
7.00
Wiring EFIS to Radios & ADC
Details
       

 08-29-2006
5.50
Panel and firewal wwiring
Details
       

 08-11-2006
1.50
Mounting of Dynon D10A back-up EFIS
Details
       

 08-10-2006
4.75
Center Radio Stack
Details
       

 08-09-2006
3.25
physical assembly of the 2 outboard panels
Details
       

 08-08-2006
4.25
Physically mount the EFIS & MFD
Details
       

 08-07-2006
3.25
Initial configuration of sub-panel
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.