|
|
|
|
Deems RV10 Project
|
Date: 7-18-2007
|
Number of Hours: 4.50
|
Manual Reference: Sec Ram-4
|
Brief Description: Sec Ram-4
|
|
Thought I'd finish this up today..... But. Actually last night I was able to get a jump on sanding the SuperFil, got up early 9before the heat and finished up the sanding. NBEeded a little more fill, so used some metal glaze to slightly build up some areas, resanded , reapplied glaze, resanded...... Finally I thought it was ready for prime, mixes up a couple of OZ of Smoothprime and used the credit card to squeege on a layer all around , fills pinholes better than any other approach, Sanded that w. some 100 grit when it dried and then shot 3 coats of Smooth Prime, All was going well (minus a couple fo runs) until I noticed some 'bumps on the lower right side of the induction intake, you can see thim in picture # 3 below. Even though these are probably never going to be seen by anyone, they will bug me forever, so tomorrow (or later tonight after sundown, just to danr hot now -112) I'll get the metal glaze out and fill/blend and remove the 'bumps' then we'll get back to the priming.
|
|
SuperFil sanded
|
|
Meal glaze applied and Smoothprime squeeged into pinholes
|
|
3 coats of Smoothprime and you can see the 'bumps' in this picture. Will fix when it cools some
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |