Powered By Kitlog Pro v2.0
My Airplane Projects
C120
Engine
10-19-2020
< Previous Log Entry
Next Log Entry >
Date:
10-19-2020
Number of Hours:
0.00
Manual Reference:
Brief Description:
Oil leak work, other.
Stopped at FBO and picked up oil test kit and ordered oil tank plug, O rings, crush gaskets, and Chemseal polysulfide sealer.
Adjusted voltage regulator down slightly. I noticed on last flight generator was pushing out 14+ volts.
Used Dremel and ScotchBrite wheels to clean old sealer off of engine bottom joint. Retorqued ¼” case half clamping bolts.
Flushed oil tank. Out came a dead housefly and a few other pieces of crud.
Test fitted the new snap studs and tried various screws and rivets for possible installation.
Former ooccupant of oil sump.
Old sealant coming off.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fleet Model 16 Home
C120 Home
Category
# Logs
# Hours
All
611
1356
Avionics
3
46
Elevators
16
58
Engine
81
102
Engine
6
132
Exterior Finish
11
140
Firewall Forward
6
132
Flight Tests
10
46
Fuel System
6
Fuselage
228
311
Horizontal Stab.
17
65
Interior
12
Lighting
2
44
Miscellaneous
78
4
None
2
Preparation
4
44
Rudder
14
52
Skiis
4
Wheels & Brakes
6
Wings
105
180
RV-12 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.