KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  4-23-2020
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Cables, baffles, headliner.

John: Ordered rubber for fairings, researched primers and parts,

Sam: Determined hardware to order for mixture cable end, ordered. Bolted airbox to baffles near bottom of airplane and safety wired. Attached mixture cable to clamp and holder. Fabricated and installed with clecos the speaker/headliner suspension bracket.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.