KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  4-21-2020
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Many FWF tasks.

John at home: Got C clip from ACE. Reasembled landing light. Still no joy on motor. Radio Shack ohmeter failing.

Sam at airport: Repaired and replaced breather tube. Reinstalled FWF primer line. Completed baffle installation. Installed left shroud and scat tubes. Hooked up engine controls. Pressure tested fuel lines roots to carb. Began work on cowl. Finished baffle installation. Finished left shroud and scat tube installation. Installed/secured firewall to engine primer line. Hooked up throttle and carb heat controls.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.