Powered By Kitlog Pro v2.0
Bens RV-10 Site (Non-Active)
RV-10
Horizontal Stabilize
12-7-2011
< Previous Log Entry
Next Log Entry >
Date:
12-7-2011
Number of Hours:
2.00
Manual Reference:
Ch 8
Brief Description:
Front Spare prep & support fabrication
This evening after dinner I fabbed the front spar support rails. I next drilled the holes into the supports and deburred the holes.
Every small piece is progress.
FYI...thus far I'm up to about 110 hours.
Pics on the way later...
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-10 Home
Category
# Logs
# Hours
All
101
277
Education
2
20
Elevator
25
64
Empennage
2
16
Horizontal Stabilize
18
48
None
1
0
Rudder
13
30
Shop Supplies
1
1
Tailcone
27
64
Tools
3
3
Vertical Stabilizer
9
31
Copyright © 2001-2024 Matronics. All Rights Reserved.