KitLog pro

Powered By Kitlog Pro v2.0

BEZJet Build
' style=
Date:  9-15-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Installed MLG Hyd Tubes in Tank

I routed the 1/4 AL Hyd tubes in the Tank. I will need to make braces to secure the tubes in place and FLOX the penetration of the tubes through the Fuselage bulkhead in place.
' style=

MLG Hdy Tubes Routed

MLG Hdy Tubes Routed

' style=

MLG Hdy Tubes Routed

MLG Hdy Tubes Routed

' style=

MLG Hdy Tubes Routed

MLG Hdy Tubes Routed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.