Finished torqueing the right side lines and fittings. Now I'm on to the left side. Fabricated the left side brake line that runs inside the gear tower complete with insulating clear plastic sleeve for protection and the AN 4 fittings flared onto the ends. I then got it installed in the fuselage. Next up - vent line!