KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  10-1-2009
Number of Hours:  0.90
Manual Reference:  
Brief Description:  Brake lines #6

Technically it was vent lines and more specifically, the left side vent line. Fabricated it and installed it this morning. Started looking at the brake lines as they enter the gear legs and it looks like tight quarters, but I'll see what I can do.
' style=

Left gear tower shoing the lines installed

Left gear tower shoing the lines installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.