KitLog pro

Powered By Kitlog Pro v2.0

Russells RV10 Project
Work Logs Found: 9
Category Work Time: 27 Hours
 Date
Hours
Work Log Summary

Details

 06-04-2012
4.00
Fuel level calibration
Details

 05-31-2012
4.00
Avionics Checkout
Details

 11-14-2011
1.00
New MFD and XM
Details

 10-21-2011
2.00
Installed the G900 panels
Details
     

 10-18-2011
6.00
Panel install
Details
       

 10-17-2011
4.00
Panel install prep
Details

 05-25-2011
4.00
Panel Modifications
Details
     

 05-24-2011
1.00
ELT Antenna
Details
     

 09-10-2010
1.00
Panel Arrived
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.