KitLog pro

Powered By Kitlog Pro v2.0

Russells RV10 Project
Work Logs Found: 174
Category Work Time: 648 Hours
 Date
Hours
Work Log Summary

Details

 06-17-2012
2.00
Door finishing
Details

 06-16-2012
2.00
priming
Details

 06-15-2012
3.00

Details

 06-14-2012
3.00

Details

 06-13-2012
2.00

Details

 06-12-2012
4.00
Interior Panels
Details

 06-11-2012
3.00
Interior panels
Details

 06-09-2012
2.00
Interior Stuff
Details

 06-08-2012
1.00
A/C Recharge
Details

 06-04-2012
4.00
Fuel level calibration
Details

 06-01-2012
4.00
Weight and Balance
Details

 05-31-2012
4.00
Avionics Checkout
Details

 11-14-2011
1.00
New MFD and XM
Details

 11-12-2011
2.00
Plumbed Oxygen modules
Details

 11-09-2011
3.00
Root Fairings
Details

 11-07-2011
1.00
Flap Position
Details

 11-05-2011
5.00
Wheels pants and Misc
Details

 11-04-2011
4.00
Leg Fairings
Details

 10-31-2011
6.00
Started Wheel Pants
Details

 10-22-2011
4.00
Rear seat belt mounts
Details
       

 10-21-2011
6.00
Overhead panel closing
Details
       

 10-21-2011
2.00
Installed the G900 panels
Details
     

 10-20-2011
8.00
Finished Empennage install
Details
       

 10-20-2011
2.00
Brake Lines
Details
       

 10-19-2011
4.00
Quadrant Install
Details
     

 10-18-2011
6.00
Panel install
Details
       

 10-17-2011
4.00
Panel install prep
Details

 10-15-2011
2.00
Installed GPS antennas
Details
     

 10-14-2011
4.00
Windscreen finishing
Details
       

 09-24-2011
6.00
Oil Door
Details
       

 09-23-2011
4.00
Cowling Air inlet
Details
       

 09-22-2011
4.00
Charging Port
Details
       

 09-21-2011
4.00
Baffle Seals
Details
       

 09-19-2011
8.00
EngineWiring
Details
       

 09-12-2011
16.00
Doors Part 5
Details
       

 09-05-2011
2.00
Overhead Console
Details
       

 08-08-2011
1.00
More Baffles 2
Details
       

 08-08-2011
8.00
More Baffles
Details
       

 07-13-2011
16.00
Air Box
Details
       

 07-11-2011
7.00
Cowl Install
Details
     

 07-06-2011
6.00
A/C Compressor bracket
Details
       

 06-08-2011
6.00
Spinner and Propellor
Details
       

 06-07-2011
8.00
Baffles
Details
     

 06-06-2011
4.00
Heater Controls
Details

 06-03-2011
4.00
Engine Mounting
Details
       

 06-02-2011
8.00
Landing Gear
Details
       

 05-30-2011
8.00
Interior Wiring
Details
       

 05-25-2011
4.00
Panel Modifications
Details
     

 05-24-2011
4.00
Overhead and return vents
Details
       

 05-24-2011
2.00
Fill station
Details
     

 05-24-2011
1.00
ELT Antenna
Details
     

 05-02-2011
4.00
Door windows
Details
       

 04-25-2011
8.00
Door latches
Details
       

 04-15-2011
4.00
Door Struts
Details
       

 04-14-2011
4.00
Door Hinges
Details
     

 04-13-2011
8.00
Left Door Trimming and Fitting
Details

 04-11-2011
8.00
Right Door Trimming And Fitting
Details

 04-08-2011
3.00
Cowl Hinges
Details
     

 04-07-2011
2.00
Doors part 4
Details
     

 04-06-2011
3.00
Doors part 3
Details
       

 04-06-2011
5.00
Doors part 2
Details
       

 04-05-2011
5.00
Doors part1
Details
       

 02-07-2011
4.00
Canopy Cover
Details
       

 02-03-2011
4.00
Boot Cowl
Details
       

 02-02-2011
4.00
Battery and contactors
Details
       

 10-26-2010
4.00
Battery Mount
Details
       

 10-25-2010
6.00
A/C Bulkhead and bottom vents
Details
       

 10-24-2010
2.00
Battery planning
Details
       

 10-21-2010
4.00
Bottom Wing skin
Details
     

 10-20-2010
4.00
Magnetometer Mount
Details
       

 10-19-2010
6.00
Pitot mount
Details

 10-17-2010
2.00
Floor cut out
Details
       

 10-16-2010
3.00
Rear Seat backs
Details
       

 10-16-2010
3.00
More seat back stuff
Details
       

 10-15-2010
4.00
Floor nut plates and covers
Details
       

 10-15-2010
4.00
Baggage Door Install
Details
       

 10-14-2010
5.00
Baggage Door
Details
       

 10-13-2010
5.00
Rear Floors and baggage area
Details
       

 10-12-2010
4.00
Rear Floor stuff
Details

 10-11-2010
4.00
Forward Fuselage
Details
     

 10-07-2010
4.00
A/C System fitting
Details
       

 10-06-2010
4.00
Oxygen install
Details
       

 10-05-2010
1.00
Battery
Details
     

 10-03-2010
5.00
Wing connectors
Details
       

 10-01-2010
4.00
Tailcone wiring and static lines
Details
     

 09-30-2010
1.00
Stick Grips
Details
       

 09-29-2010
3.00
Rudder Trim
Details
     

 09-28-2010
10.00
More Wiring Routing
Details
       

 09-26-2010
2.00
Baggage Door
Details
     

 09-26-2010
4.00
Baggage and rear seat floors
Details
     

 09-24-2010
4.00
RSM mount and Static Ports
Details
       

 09-23-2010
6.00
More Wire routing
Details
       

 09-22-2010
8.00
Wire Routing
Details
       

 09-18-2010
1.00
Aileron Trim Servo
Details
       

 09-18-2010
6.00
Aileron Controls
Details
       

 09-14-2010
4.00
Pitot Line and AOA line
Details
       

 09-10-2010
1.00
Panel Arrived
Details
       

 08-30-2010
4.00
Finished Riveting Floors
Details

 08-23-2010
6.00
Insulation installation
Details
       

 08-17-2010
4.00
Dynon Pitot Mount cont.
Details
       

 08-16-2010
4.00
Dynon Pitot Mount
Details
       

 08-11-2010
4.00
Stall warning, Wiring runs
Details
       

 08-10-2010
1.00
Fuel tank pressure test
Details
     

 08-10-2010
6.00
ADHRS Tray installation
Details
       

 08-09-2010
4.00
ELT, Elevator Trim installed
Details
       

 08-07-2010
3.00
Brake Lines cont.
Details
       

 08-06-2010
6.00
Fuel Lines
Details
       

 08-05-2010
6.00
Brake Lines
Details
       

 08-03-2010
6.00
Control System
Details
     

 08-02-2010
4.00
Tailcone Attachment cont. 2
Details
       

 07-31-2010
2.00
Tailcone Attachment Cont.
Details
       

 07-31-2010
6.00
Tailcone Attachment
Details
       

 07-29-2010
0.00
Rudder Pedals Cont.
Details
       

 07-29-2010
3.00
Rudder Pedals
Details
       

 07-28-2010
4.00
Plans preview, Fuselage Inspection
Details
     

 07-26-2010
0.00
Quickbuild Arrival 2
Details
       

 07-26-2010
2.00
Quickbuild Arrival
Details
       

 05-17-2010
1.00
Prop Arrived.
Details
       

 03-11-2010
3.00
Fairing Attachment
Details
       

 03-10-2010
2.00
Empennage Attach
Details
       

 03-10-2010
2.00
Empennage Attach
Details
       

 03-10-2010
1.00
Empennage Attach
Details
       

 03-09-2010
2.00
Elevator Trim Servo Tray
Details
       

 03-08-2010
6.00
Tailcone Final Assembly
Details
       

 03-08-2010
0.00
Tailcone Final Assembly
Details
       

 03-05-2010
4.00
Tailcone Final Assembly
Details
       

 03-04-2010
1.00
Tailcone Final Assembly Bulkheads cont 1
Details
       

 03-04-2010
1.00
Tailcone Final Assembly Bulkheads
Details
       

 03-04-2010
2.00
Tailcone Final Assembly
Details
       

 03-04-2010
4.00
Tailcone battery/bellcrank mount
Details
       

 03-03-2010
1.00
Tailcone painting cont.
Details
     

 03-01-2010
12.00
Tailcone painting
Details
       

 02-23-2010
3.00
Trim Tab Finishing and Attachment
Details
       

 02-19-2010
6.00
Trim Tab assembly
Details
       

 02-18-2010
3.00
Elevator right assembly cont.
Details
       

 02-18-2010
2.00
Elevator right assembly cont.
Details
       

 02-18-2010
2.00
Elevator right assembly cont.
Details
       

 02-17-2010
6.00
Elevator right assembly
Details
       

 02-16-2010
8.00
Elevator Left assembly
Details
     

 02-15-2010
6.00
Elevator left assembly
Details
       

 02-07-2010
1.00
Fuselage Tailcone Assembly part 2 cont B
Details
       

 02-04-2010
3.00
Fuselage tailcone Assembly Part 2 cont A
Details
       

 02-04-2010
5.00
Fuselage tailcone Assembly Part 2
Details
       

 02-03-2010
2.00
HS More Riveting
Details
       

 02-03-2010
0.00
Fuselage Tailcone more bulkheads
Details
       

 02-03-2010
3.00
Fuselage Tailcone bulkheads
Details
       

 02-03-2010
0.00
Fuselage Tailcone Assembly part 1 cont.
Details
       

 02-03-2010
2.00
Fuselage Tailcone assembly part 1
Details
       

 02-03-2010
1.00
Elevator Started wrong part discovered
Details
       

 02-02-2010
3.00
HS Riveting
Details
       

 02-02-2010
3.00
HS Main Spar Assembly
Details
       

 02-01-2010
4.00
HS - Scuffing and Priming parts
Details
       

 02-01-2010
2.00
HS - Counter sinking main spars
Details
       

 01-27-2010
4.00
HS - Assembled drilled then disassemb
Details
       

 01-26-2010
3.00
HS - Spars and ribs
Details
       

 01-25-2010
2.00
Rudder Finished
Details
       

 01-21-2010
3.00
Rudder finishing
Details
       

 01-19-2010
2.00
HS stab main spars
       

 01-18-2010
3.00
Rudder Assembly
Details
       

 01-17-2010
5.00
Rudder Debur, demple, prime
Details
       

 01-15-2010
3.00
Paint booth
Details
       

 01-14-2010
0.00
Rudder Skinned
Details
       

 01-14-2010
1.00
Rudder Problem
Details
       

 01-14-2010
1.00
Rudder More Fabrication
Details
       

 01-14-2010
1.00
Rudder fabrication
Details
       

 01-13-2010
4.00
VS Riveting Skin
Details
       

 01-13-2010
0.00
VS Complete minus caps
Details
       

 01-12-2010
2.00
VS Riveting
Details
       

 01-12-2010
2.00
VS Priming
Details
       

 01-12-2010
0.50
VS More Priming
Details
       

 01-12-2010
1.00
VS Dimpling
Details
       

 01-11-2010
4.00
Vertical Stab
Details
       

 01-07-2010
2.00
Empennage Inventory
       

 01-07-2010
0.00
Empennage Arrives
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.