Powered By Kitlog Pro v2.0
Jason Heath's Cozy MKIV
MarkIV
Ch9 Main Gear & LB
58 Logs Found
Date
Hours
Work Log Summary
Details
07-06-2008
0.0
Main Gear Complete
07-05-2008
0.0
Axle, Brake, Heat Sheild assembly
07-04-2008
0.0
Brake Caliper Clearance
07-03-2008
0.0
Leg Ends Trimmed
07-02-2008
0.0
Heat Sheild & Backing Plate
07-01-2008
0.0
Bolt holes drilled and alignment Quadruple checked
06-30-2008
0.0
Flox Pad w/ proper Toe & Camber
06-29-2008
0.0
3 ply BID Wrap
06-28-2008
0.0
Axle Alignment Test
06-26-2008
0.0
Axle Mounting Templates
06-25-2008
0.0
The Goods
06-24-2008
0.0
Ready for Wheels
06-23-2008
0.0
BID Tape on underside of LG box cover
06-22-2008
0.0
LG Box Glassed
06-19-2008
0.0
Foam filler & 2 Ply BID over MG-3
06-18-2008
0.0
Washer & 2 Ply BID on LG Tabs
06-16-2008
0.0
Torque Tube Holes Drilled in LG Bulkheads
06-15-2008
0.0
Landing Gear Box Cover
06-14-2008
0.0
Landing Brake Actuator
06-11-2008
0.0
Inside layup on Landing Brake
06-10-2008
2.0
More Landing Brake (hinge)
05-27-2008
0.0
Landing gear cover completed
05-26-2008
0.0
Landing Brake recess trimmed
05-25-2008
0.0
Landing brake recess glassed
05-24-2008
0.0
LG cover inside glassed
05-22-2008
0.0
Landing brake (continued)
05-21-2008
0.0
LG Cover, inside profile
05-20-2008
0.0
LG cover removed and trimmed
05-19-2008
1.0
Gear Cover Glassed
05-18-2008
0.0
Landing Gear Cover
05-16-2008
0.0
3/4" Holes in LG Tabs w/mg-3's
05-11-2008
0.0
MG-4 installation
05-10-2008
12.0
Gear leg mounting hardware
05-10-2008
0.0
Floxing in MG plates
05-09-2008
0.0
Test fit of MLG
Details
05-06-2008
0.0
All layups trimmed
05-04-2008
0.0
Hell hole reinforcement
Details
05-03-2008
0.0
Reinforcements between forward LGB and rear LGB
05-02-2008
0.0
Forward LGB reinforcements
05-05-2007
0.0
Landing brake hinge parts
04-24-2007
0.0
Landing Brake
03-31-2007
0.0
Second 45 ply trimmed
Details
03-17-2007
0.0
Second Layup
03-16-2007
0.0
Attached tabs ready for second layup
01-28-2007
0.0
First 45 layer layup
01-27-2007
0.0
Ready for layup
01-27-2007
0.0
Closeups
01-26-2007
0.0
Inverted and mounted to table
01-26-2007
0.0
Fixture bondoed to strut
01-25-2007
0.0
Geometric Futility Jig
01-25-2007
0.0
Fixture parts
01-21-2007
5.0
2nd 4 ply UNI layup
01-19-2007
2.0
Conduit layup trimmed
01-18-2007
2.0
2 ply BID layup on conduit
01-17-2007
1.0
Brake line conduit
01-14-2007
6.0
1st 4ply layup
01-13-2007
0.0
Main Strut Preperation
08-23-2006
0.0
Main Gear Strut
SITE NAVIGATION
Contact Builder
MarkIV Home
All
Ch1-3 Pre-Planning
Ch13 Nose Gear
Ch18 Canopy
Ch4 Bulkheads
Ch5 Fuselage Sides
Ch6 Fuselage Assembl
Ch7 Exterior
Ch8 Headrest & Seatb
Ch9 Main Gear & LB
EAA Airventure
Links
Wheel Pants
Copyright © 2001-2013 Matronics. All Rights Reserved.