KitLog pro

Powered By Kitlog Pro v2.0

Jason Heath's Cozy MKIV
30 Logs Found 
 Date
Hours
Work Log Summary

Details

 10-16-2006
0.0
Outside Shots
       

 10-16-2006
0.0
Inside Shots w/Bottom
       

 10-15-2006
0.0
Fuse Ready for Bottom 2
       

 10-15-2006
0.0
Bottom Floxed to Assembly
       

 10-14-2006
0.0
Fuselage Ready for Bottom
       

 10-10-2006
0.0
Bottom Ready to Flox onto Assembly
       

 10-08-2006
0.0
Bottom Layup Complete
       

 10-08-2006
0.0
Bottom Layup Beginning
       

 10-07-2006
0.0
Ready to Glass Bottom
       

 09-16-2006
0.0
3/4" Foam Installed
       

 09-14-2006
0.0
Bottom Ready for 3/4" Foam
       

 09-11-2006
0.0
Frame for Fuselage Bottom
       

 09-10-2006
0.0
Contouring Bottom
       

 09-09-2006
0.0
Fuselage Bottom
       

 09-08-2006
0.0
Duct & Keel Installation
       

 09-07-2006
0.0
Heat duct & Keel Assembly
       

 08-29-2006
0.0
Heat Duct & Keel
       

 08-26-2006
0.0
Lower Permanent Firewall
       

 08-25-2006
0.0
Heat Duct Foam
       

 08-23-2006
0.0
Aft Face Forward LGN 6 Ply UND Layup
       

 07-19-2006
0.0
Inverted Fuselage
       

 07-18-2006
0.0
Forward Face UND Layup
       

 07-17-2006
0.0
Forward LGB (Upper)
       

 07-16-2006
0.0
Gear Attach Holes
       

 07-15-2006
0.0
Forward LGB (Lower)
       

 07-14-2006
0.0
Aft LGB
       

 07-08-2006
0.0
F28 & Canard Reinforcement
       

 05-28-2006
0.0
Assembly Interior 2
       

 05-28-2006
0.0
Assembly Interior 1
       

 05-27-2006
0.0
Assembly Exterior
       











Copyright © 2001-2013 Matronics. All Rights Reserved.