KitLog pro

Powered By Kitlog Pro v2.0

Barry's RV14A
Work Logs Found: 32
Category Work Time: 79 Hours
 Date
Hours
Work Log Summary

Details

 10-10-2022
5.70
CHT, EGT, Oil Temperature & Flow Flow Transducer..
Details
       

 10-09-2022
2.50
Plan B - Shrink Wrap Shortage...
Details
     

 10-08-2022
7.50
Panel Organizing & CHT/EGT Probe Wiring...
Details
       

 10-02-2022
2.50
G3X 100-amp Shunt
Details
     

 09-28-2022
2.50
Alternate Air Door...
Details
       

 09-26-2022
3.30
Throttle, Mixture Prop...
Details
       

 09-25-2022
3.80
Added Some Colors...
Details
       

 01-06-2022
1.25
Installation of 5" Scat Tube to Oil Cooler
Details
       

 01-04-2022
1.75
Installed Oil Line Hoses. Added RTV to Oil Cooler

 12-16-2021
1.00
Adjust Linkage to Fuel Control & Bellcrank
       

 12-14-2021
0.75
Install Mixture Bellcrank & Throttle Bracket
     

 12-14-2021
2.50
Assemble Mixture Bellcrank & Throttle Bracket

 07-21-2021
2.25
Install Alternator & Wire Starter & Alternator
     

 07-18-2021
2.00
Install Fuel Flow Transducer w/Hoses
       

 07-17-2021
1.00
Prep, RTV & Install Right Vent Modification
       

 07-15-2021
0.75
Installed Manifold, Fuel & Oil Pressure Sensors
       

 07-15-2021
1.75
Completed Air Filter Frame Assmbly
     

 07-14-2021
2.75
Begin Assemly of Air Filter Frame
       

 07-13-2021
2.75
Continue Working Baffling Assembly.

 07-12-2021
2.25
Assemble Right Aft Baffle
       

 07-11-2021
4.50
Begin Baffling Assemblies
       

 07-06-2021
0.75
Mount Propeller Governor to Engine
     

 07-05-2021
1.75
Complete Plumbing of Engine, Attach Fittings

 07-04-2021
1.50
Begin Plumbing of Engine, Attach Fittings

 06-26-2021
1.00
Deburr B/O Baffling Parts

 06-26-2021
1.00
Continue Installation of Firewall Forward
     

 06-25-2021
2.50
Begin Firewall Component Installations
Details
       

 06-16-2021
2.50
Finish Deburring In Stock Parts to be Anodized
     

 06-03-2021
6.25
Finish Deburring Baffelling
     

 05-29-2021
3.20
Continue Deburring Baffelling
     

 05-26-2021
3.00
Begin Deburring Baffelling
     

 05-17-2021
1.00
Deburr & Buff FF-00009A&B Governor Bracket
     










Copyright © 2001-2024 Matronics. All Rights Reserved.