KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 30
Category Work Time: 77 Hours
 Date
Hours
Work Log Summary

Details

 09-26-2021
3.00
Brian Hoover drops out to assist with engine issue
       

 09-19-2021
3.00
Add fuel, engine start
       

 06-27-2021
4.00
Add oil, turn engine over,
       

 06-26-2021
1.50
Set timing
       

 01-17-2021
3.50
Finish engine wiring
       

 01-13-2021
2.00
Wiring firewall foreward,
       

 01-10-2021
4.50
Wiring firewall foreward, e mags
       

 10-11-2020
2.00
Finish control cables
       

 10-04-2020
1.50
Install control cables,
       

 09-30-2020
1.50
Airflow induction bracket, order brake lines
     

 08-30-2020
3.00
Controls panel mount bracket, avionic planning
     

 08-29-2020
3.00
Sniffle valve,oil cooler, avionics planning
       

 08-16-2020
3.50
Install exhaust
       

 08-12-2020
2.00
Baffles
       

 08-09-2020
3.00
Alt air door install, on snorkel
       

 07-26-2020
2.00
Flox snorkle to air filter frame
       

 07-19-2020
4.00
Wiring, snorkel test fit
       

 07-11-2020
3.00
Tension rods, baffles

 07-08-2020
2.00
Engine baffles
       

 07-05-2020
3.00
Right forward baffle, air filter frame
       

 06-23-2020
2.00
Sealant baffles, air filter frame
       

 06-10-2020
2.00
Torque prop, cylinder baffles
Details
       

 06-03-2020
2.00
Start on engine baffles
       

 05-17-2020
3.50
Engine prep, alternator
       

 05-13-2020
2.50
Engine prep fuel system
       

 05-06-2020
2.00
Hang engine
       

 05-03-2020
3.00
Engine prep, prop governer install
     

 04-25-2020
2.00
Install master relay and starter solenoid
       

 04-22-2020
1.00
Battery install
     

 03-12-2020
2.00
Engine arrives
       










Copyright © 2001-2024 Matronics. All Rights Reserved.