KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 21
Category Work Time: 58 Hours
 Date
Hours
Work Log Summary

Details

 02-07-2021
3.00
Sticks wiring, test switches
       

 02-03-2021
2.00
Prayer before the switch flipped, no smoke!!!
       

 01-20-2021
1.00
Pitot heat AOA wiring
       

 01-06-2021
2.00
Wiring firewall foreward, vpx issue
       

 01-03-2021
3.00
Canopy harness, clean up wiring
       

 01-02-2021
4.00
LED light strip, wiring glareshield, fans, canopy
       

 12-30-2020
2.75
Wiring seat heaters,panel wiring , engine monitori
       

 12-27-2020
4.00
Routing wire harnesses,and wiring
Details
     

 12-20-2020
5.00
Install vents, brake lines, and panel
Details
       

 11-27-2020
2.00
Antennas, close up tailcone
       

 11-25-2020
2.50
Install GPS antennas
       

 11-18-2020
2.50
GPS antenna attach plates
       

 11-15-2020
3.50
OAT probe and wiring,pitot static lines
       

 11-08-2020
3.00
Install radio antenna's
       

 10-28-2020
2.00
Wire ELT,GMU 22 install
       

 10-18-2020
4.00
Refit snorkle, start to run wire harness's,antenna
       

 09-13-2020
3.50
Panel out,avionics trays install
       

 09-07-2020
2.50
Panel switch's , mixture control
     

 09-02-2020
2.00
Preliminary panel fit
     

 08-19-2020
2.00
Panel arrives, inventory, exhaust brace
       

 01-05-2020
2.00
Plan avionics
     










Copyright © 2001-2021 Matronics. All Rights Reserved.