KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 80
Category Work Time: 208 Hours
 Date
Hours
Work Log Summary

Details

 07-07-2021
2.00
Finish air dams
       

 06-30-2021
2.50
Cowling, install baffles
       

 06-29-2021
2.00
Cowling, air inlet ramps
       

 06-28-2021
2.00
Install air inlet ramps
       

 06-12-2021
2.50
Repair wingtips, Hinge pin door
       

 05-23-2021
3.00
Cowling, oil door
       

 05-19-2021
2.50
Cowling
     

 05-16-2021
3.00
Cowel fitting issues
       

 05-09-2021
4.00
Drill Coweling
       

 05-02-2021
3.50
Cowel hinges
       

 04-28-2021
2.00
Cowel
       

 04-25-2021
5.00
Cowel
       

 04-21-2021
2.00
Work on cowling
       

 04-18-2021
4.00
Work on cowling
       

 04-14-2021
2.00
Start on cowling
       

 03-03-2021
2.00
Calibrate flaps, assess cowel, Brian Hoover helps
       

 02-28-2021
3.00
Work on install interior
       

 12-06-2020
4.00
Seat backs, and wiring
       

 11-29-2020
4.00
Seat belts, flap trim motor linkage
       

 07-22-2020
1.50
Interior kit inventory
       

 12-05-2019
5.00
Tail fairing
       

 11-24-2019
1.50
Empennage tail fairing
       

 11-17-2019
1.00
Wheel pants
     

 11-14-2019
2.50
Empannege fairing trim
       

 11-02-2019
4.00
Gear leg fairings
       

 10-24-2019
2.00
Wheel pants
     

 10-13-2019
3.00
Wheel pants
       

 10-10-2019
2.00
Wheel pants
       

 10-02-2019
1.50
Wheel pants
     

 09-07-2019
0.50
Wheel pants
     

 07-20-2019
3.00
Guide pin install,
       

 07-14-2019
3.00
install canopy pin
       

 07-07-2019
3.00
Rear fairing
     

 06-30-2019
3.00
Close out wings, light lens
       

 06-20-2019
2.00
Canopy clips
     

 06-13-2019
2.00
Canopy seals

 06-05-2019
2.00
Canopy seals

 05-15-2019
1.00
Rear seal issues on canopy

 05-09-2019
1.50
Canopy on
       

 05-04-2019
3.00
Canopy fairing
       

 04-27-2019
3.00
Canopy fairing,
       

 04-20-2019
4.00
Canopy fairing layup
       

 03-30-2019
2.00
Canopy fairing
       

 03-24-2019
4.00
Canopy
       

 03-21-2019
1.50
Rear seal
       

 03-10-2019
3.50
Canopy
       

 03-02-2019
3.50
Install steps
       

 02-27-2019
1.50
Work on Canopy
     

 02-09-2019
3.00
Work on wing root
       

 02-06-2019
2.50
Install,flaps
       

 02-03-2019
3.50
Install wings
       

 01-23-2019
2.00
Drill canopy
       

 01-15-2019
2.00
Drill canopy
       

 01-09-2019
2.00
Weightedbags for canopy, sand contact areas
       

 01-06-2019
3.00
Canopy install, supper at the hanger!
       

 12-22-2018
3.00
Paint baggage compt. sidewall, finish rear window
       

 12-16-2018
3.00
Re-install rear window
       

 12-13-2018
2.00
Canopy
       

 12-09-2018
3.50
Canopy assembly
       

 12-06-2018
2.50
Canopy forward closeout
Details
       

 11-25-2018
3.00
Canopy assembly
       

 11-21-2018
2.00
Canopy skin
       

 11-18-2018
2.00
Canopy handle, skin prep
       

 11-15-2018
2.50
Canopy side skins, rails
       

 11-07-2018
1.50
Canopy rails, side skins
     

 11-04-2018
3.00
Canopy frame, close out, rails
       

 10-27-2018
3.00
Canopy skin
       

 10-24-2018
2.50
Canopy parts
       

 10-21-2018
1.50
Rear canopy install difficulties, canopy latch sys
       

 10-02-2018
2.50
Canopy latch pushrod assembly
       

 09-30-2018
3.00
Install air vents, latchbellcrank assembly
       

 09-22-2018
2.00
Rear window install
       

 09-19-2018
2.50
Air vents, start rear window
       

 09-16-2018
3.00
Seatback assembly
       

 09-12-2018
2.50
Install tail gear spring, start seatbacks
       

 09-09-2018
3.50
Install axle, wheels, brakes, brake lines
       

 09-08-2018
4.00
Main wheel,tire assembly, install gear
       

 09-06-2018
2.50
Engine mount
       

 04-08-2018
3.00
Inventory finish kit-Amanda, Lynette help
       

 03-15-2018
0.50
Finish kit arrives
       










Copyright © 2001-2024 Matronics. All Rights Reserved.