KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
Work Logs Found: 149
Category Work Time: 740 Hours
 Date
Hours
Work Log Summary

Details

 08-08-2021
3.00
Storage of the wings
Details
       

 08-01-2021
8.00
Corrosion !
Details
       

 05-17-2020
4.00
Moving wings out of garage
Details

 02-02-2020
6.00
Rivet flaps hinge
Details
     

 02-01-2020
5.00
Riveting intrados of RW
Details
       

 01-26-2020
2.00
Fuel tank leak repaired
Details
       

 01-25-2020
5.00
RW riveting continuing
Details
       

 01-18-2020
5.00
Riveting bottom skin on RW
Details
     

 01-12-2020
7.00
RW flap brace
Details
       

 01-05-2020
7.00
Errands before rivet bottom skins to ribs final
Details
       

 12-27-2019
8.00
Flap installation on RW
Details
       

 12-26-2019
6.00
Installing the RW aileron on the wing
Details
       

 12-22-2019
4.00
RW Aileron bracket
Details
       

 12-21-2019
4.00
Reassembling the RW
Details
       

 10-20-2019
6.00
Finish LW bottom skin rivetting
Details
       

 10-14-2019
6.00
Start riveting bottom skin
Details
       

 10-13-2019
8.00
Finishing details
       

 10-12-2019
5.00
Finishing details before closing wing final
       

 10-06-2019
4.00
Cleaning the tanks & preparing the area to add pro
Details
       

 10-02-2019
1.00
Checking tank leaks
Details
       

 09-29-2019
5.00
Installed the light in the RW LE
Details
       

 09-28-2019
7.00
Light install in LW LE
Details
     

 09-22-2019
3.00
LE Duckworks LE light -- starting the install
Details
       

 09-21-2019
2.00
Finish preparing the aileron gap fairing on LW
Details
     

 09-15-2019
4.00
Rivetted the flap brace
Details
       

 09-14-2019
6.00
Re-did my flap brace
Details
       

 09-08-2019
12.00
Various
Details
       

 08-10-2019
6.00
Installing aileron on wing
Details
       

 07-28-2019
4.00
Left flap final riveting
       

 07-21-2019
4.00
Right flap riveted
Details
       

 07-14-2019
5.00
Final riveted both aileron
Details
       

 06-07-2019
7.00
Prosealed the RW rear baffle
Details
       

 06-02-2019
9.00
Prosealed rear baffle of LW tank
Details
     

 06-01-2019
2.00
Prosealed the fuel pickup tube
Details
       

 05-26-2019
6.00
Final riveting of ailerons
Details
       

 05-18-2019
5.00
Various
Details
       

 05-11-2019
4.00
Pre-Cover inspection completed
Details
     

 04-20-2019
5.00
Errands ...
Details
       

 04-19-2019
5.00
Riveting RW extrados
Details
       

 04-14-2019
11.00
RW preparation
Details
       

 04-13-2019
5.00
LW extrados riveting
Details
       

 04-07-2019
10.00
LW preparation for reveting
Details

 03-31-2019
10.00
Deburring & dimpling bottom skins
Details

 03-23-2019
10.00
Working on left wing bottom skins
Details
       

 03-17-2019
8.00
Drilling skins LW-under side
Details
       

 03-10-2019
8.00
Changing wing position on jig & drilling bottom ou
Details
       

 03-06-2019
7.00
Riveted both flaps
Details
       

 03-03-2019
12.00
Debur, dimble & prime
Details
       

 02-24-2019
4.00
Lightning holes & began installing top skin
Details
       

 02-23-2019
2.00
Drilling root bracket on the other flap
Details
     

 02-17-2019
9.00
Started the flaps
Details
       

 02-16-2019
7.00
Fixed the tip rib & completed the other aileron
Details
       

 02-10-2019
6.00
Try completing the LW-Aileron
Details
       

 02-09-2019
6.00
Finish RW aileron
Details

 02-06-2019
2.00
Finish drilling bottom side of RW aileron
Details
       

 02-03-2019
7.00
Riveting, bending & more drilling !
       

 02-02-2019
5.00
clean, dimpling, prime
       

 01-20-2019
8.00
Aileron preparation continuing
Details
       

 01-19-2019
5.00
Making the Aileron skin stiffener
Details
       

 01-13-2019
3.00
Aileron skeleton
Details
       

 01-12-2019
6.00
Starting the aileron
Details
       

 01-06-2019
5.00
Tanks almost done !
Details
       

 01-05-2019
4.00
Proseal top side of left tank
Details
       

 12-28-2018
6.00
Continuing prosealing the left fuel tank
Details
       

 12-02-2018
4.00
LW-Tank riveting
Details
       

 12-01-2018
4.00
LW tank pro-sealing parts
Details
       

 11-25-2018
5.00
Riveting & sealing all rivets
Details
       

 11-24-2018
5.00
Pro-seal the right tank-- continuing
       

 11-19-2018
5.00
Riveting the ribs
Details
       

 11-17-2018
10.00
First time using proseal
Details
       

 11-11-2018
8.00
Finish preparing Left wing Tank
Details
       

 10-21-2018
3.00
Skin dimpling & fixing a problem ! An other one !
Details
       

 10-20-2018
5.00
Counter sinking-dimpling
Details
       

 10-14-2018
3.00

Details
       

 10-13-2018
4.00

Details
       

 09-23-2018
4.00
Preparation continuing
Details
       

 09-22-2018
4.00
Preparation
Details
       

 09-09-2018
2.00
Finish drilling holes in LW tank
Details
       

 09-08-2018
6.00
Drilling, dimpling, nutplates install
Details
       

 09-05-2018
1.00
Installed the doubler for RW Fuel tank
Details
       

 09-03-2018
4.00
Drilling for the nut plates installation on RWT
       

 09-02-2018
2.00
Installed forward wing bracket and doublers
Details
       

 09-02-2018
2.00
Fuel hole & Fuel drain RWT
       

 09-02-2018
0.00
Doubler added
Details
       

 04-15-2018
3.00
Continue drilling LW tanks & adjusting the skins
Details
       

 04-08-2018
6.00
Drilling LW fuel tank
Details
       

 04-01-2018
12.00
Drilling, making parts and problem !
Details
       

 03-25-2018
4.00
Preparing to drill tank skin
       

 03-25-2018
5.00
Drilling tank skin of RW
Details
       

 03-24-2018
4.00
Prepared tank ribs ribs
Details
       

 03-24-2018
3.00
Drilled holes & installed ribs on rear baffle
Details
       

 03-18-2018
4.00
Rivet LE of LW
       

 03-18-2018
4.00
Finish deburring, dimpling & reassemble the wing
Details
       

 03-11-2018
9.00
Debur, dimple, assemble
Details
       

 03-04-2018
8.00
Debur, dimple, make
Details
       

 03-03-2018
7.00
Debur, dimple, prime & made parts
Details
       

 02-25-2018
6.00
Drilling & deburring LW top skin & LE
Details
       

 02-24-2018
4.00
Finish drilling the LE of LW
Details
       

 02-18-2018
6.00
cutting LE skin to lenght & start drilling it
       

 02-17-2018
6.00
Drilled inboard top skin on LW
       

 02-11-2018
6.00
Drilling top outboard skin on LW
Details
       

 02-10-2018
4.00
Drilling main ribs to rear spar
Details
       

 02-04-2018
3.00
Starting LW assembly on jig
Details
       

 02-04-2018
3.00
LW assembly
Details
       

 01-28-2018
8.00
Priming all internal parts of LW
Details

 01-21-2018
7.00
Preparing LW
Details
       

 01-21-2018
1.00
Finished riveting RW LE
     

 01-14-2018
2.00
Final LE work
       

 01-14-2018
3.00
Drilling & dimpling --- finishing LE skin
       

 01-14-2018
3.00
Cleaning , priming, riveting
       

 01-13-2018
3.00
Finish drilling second LE skin
       

 01-07-2018
1.00
Reassemble wing
       

 01-07-2018
2.00
Re-drill LE skin replacing the first one that had
Details
       

 01-07-2018
1.00
Installed the tie down final
       

 01-03-2018
4.00
Debur & dimpling
Details

 01-02-2018
3.00
Debur & dimpling
Details

 12-31-2017
3.00
Errands
       

 12-30-2017
3.00
Various errands
Details
       

 12-29-2017
4.00
One more mistake !!!
Details
       

 12-26-2017
3.00
Prepared many little things
Details
       

 12-17-2017
3.00
Other pictures of my LE work today
       

 12-17-2017
3.00
Leading edge RW - drilling
Details
       

 12-16-2017
4.00
Drilled bellcrank gussets in place and attached ha
       

 12-13-2017
2.00
Prepared Bellcrank and cut access trap
Details
       

 12-05-2017
3.00
Finish drilling inboard top skin on RW
Details
       

 12-04-2017
2.00
Drilling top inboard skin on RW
Details
       

 12-03-2017
4.00
Drilling top outside skin
       

 12-02-2017
3.00
Top outside skin prep
Details
       

 11-26-2017
4.00
Jig Modification
Details
       

 11-25-2017
8.00
Right wing level and ready for skinning
Details
       

 11-19-2017
7.00
Drill to size all pilot holes on RW & started to a
Details
       

 11-18-2017
3.00
Cut out bottom flange on rib station 73,5
Details
       

 11-12-2017
5.00
Ribs fitting on main spar
Details
       

 11-12-2017
7.00
Drilling to final size all the pilot holes in the
Details
       

 11-05-2017
4.00
Installing ribs on left wing
Details
     

 11-04-2017
1.00
Repair of station 83.5 Right wing
Details
       

 10-29-2017
5.00
Ribs install on right spar ... beginning
       

 10-29-2017
1.00
Problem
Details
       

 10-28-2017
7.00
Completed rear spar & primed
Details
     

 10-22-2017
7.00
Rear spar prep ...
Details
       

 10-21-2017
5.00
Rib deburring & bellcrank holder
       

 10-15-2017
8.00
Rib preparation continuing ...
Details
       

 10-14-2017
7.00
Ribs preparation continuing
Details
       

 10-14-2017
2.00
Rib preparation continuing
       

 10-09-2017
7.00
Ribs ... preparation continuing
       

 10-08-2017
8.00
Deburring & fluting
Details
       

 10-07-2017
5.00
Deburring ribs
Details
       

 05-06-2017
5.00
Cutting Lightning holes in wing ribs
Details
       

 04-05-2017
0.00
Pile of ribs without lightning hole yet
       










Copyright © 2001-2024 Matronics. All Rights Reserved.