Date
|
Hours
|
Work Log Summary

|
Details

|
08-10-2013
|
4.00
|
Cowling work completed (well almost).
|
Details
|
|
|
08-07-2013
|
4.00
|
Panel lables and cowling work.
|
Details
|
|
|
08-06-2013
|
5.00
|
Installing cowling with the prop installed.
|
Details
|
|
|
11-12-2012
|
4.00
|
Finished fitting the cowling.
|
Details
|
|
|
11-11-2012
|
5.00
|
Lower cowl flanges riveted & receptacles installed
|
Details
|
|
|
11-10-2012
|
4.00
|
Lower cowl side flanges installed.
|
Details
|
|
|
11-09-2012
|
7.00
|
Lower cowl installed.
|
Details
|
|
|
11-07-2012
|
6.00
|
Installed Skybolt camlocks on upper cowling.
|
Details
|
|
|
11-05-2012
|
7.00
|
Installed Skybolt flanges to FW.
|
Details
|
|
|
11-03-2012
|
4.00
|
Fabbed 13" disc to help install cowling.
|
Details
|
|
|
11-01-2012
|
4.00
|
Started the install of the cowling.
|
Details
|
|