Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
Instrument Panel
Work Logs Found:
7
Category Work Time:
20 Hours
Date
Hours
Work Log Summary
Details
04-17-2019
3.00
Static port made and installed.
Details
03-22-2019
4.00
Pitot tube was installed with structural T88 resin
Details
03-10-2019
1.00
Worked on installing the Pitot tube.
Details
03-05-2019
1.00
Pitot tube showed up and it will work perfectly
Details
02-07-2019
2.00
Sanded, painted and clear coated instrument panel
Details
03-31-2017
4.00
Worked on defrost, alternate air and interior
Details
03-29-2017
5.00
Made plate for Throttle, Mixture, Prop for cable c
Details
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
861
2586
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
79
196
Electrical/Instrumen
26
90
Engine/Propeller
142
434
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
138
412
Fuselage
78
204
Inspections
1
1
Instrument Panel
7
20
Interior
53
194
Kit Purchase/Conditi
2
26
Landing Gear/RG
31
108
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
37
102
Copyright © 2001-2026 Matronics. All Rights Reserved.