Date
|
Hours
|
Work Log Summary

|
Details

|
10-27-2016
|
24.00
|
FE-Analysis of the tailwheel
|
Details
|
|
|
06-24-2016
|
24.00
|
FE-Analysis of the main-gear-subframe
|
Details
|
|
|
04-16-2016
|
12.00
|
Disassembly Panel section
|
Details
|
|
|
03-21-2016
|
12.00
|
Disassembly Front Section
|
|
|
|
03-20-2016
|
12.00
|
Buildt a shop in the backyard
|
|
 |
|
03-19-2016
|
6.00
|
Picking up the overhauled Rotax 912
|
|
|
|
03-16-2016
|
12.00
|
Disassembling front section
|
Details
|
|
|
03-09-2016
|
2.00
|
Cutting the Fairings
|
Details
|
|
|
11-14-2015
|
16.00
|
Engine removed from the frame
|
Details
|
|
|
09-30-2015
|
2.00
|
Inspection of the fairings
|
Details
|
|
|
09-21-2015
|
4.00
|
Carb removal
|
Details
|
|
|
09-16-2015
|
12.00
|
Begining of engine removal
|
Details
|
|
|
09-02-2015
|
12.00
|
First Overall Inspection of the HB-YGA
|
Details
|
|