KitLog pro

Powered By Kitlog Pro v2.0

Matt & Val's Web Site

Builder:
Matt Pryor
Location:
Skiatook, OK - USA
Aircraft:
Zenith - Zodiac CH650-B
Manufacturer:   
http://www.zenithair.com/
Engine:
TBD -
Prop:
TBD
Total Build Time:
190 Hours

Welcome to our experimental aircraft Web site. I hope everyone enjoys watching as we document the journey of building our own airplane.

Building my own airplane has been a dream of mine as long as I can remember. I'm excited to finally get started. Our children are now grown and out of school, so it's the perfect time to get this project moving.

I've spent many years dreaming of which airplane we would build. We even bought a few sets of plans over the years. Most of them were fast, sleek, high performance models, but I realized that was not the type of flying I enjoyed. I'm happy being low and slow and watching the world pass beneath our wings.
The Zodiac CH650B is the perfect fit for us and what we want to do.

I've been an aircraft structural mechanic most of my life, so I have an uneasy confidence that this home building thing should be a piece of cake. (keep reading when you get done laughing) My confidence doesn't come from any special skills or experience, but because I have the opportunity to work on this project with my best friend, who also happens to be my wife. She is as excited as I am about getting started, and if the past 25 years are any indication of the future, she will be the driving force that gets us to the finish line.
Please contact us if you have any questions (or you see us doing something stupid) about what were doing.

Matt and Val,

NSDQ!








Recent Activity
 Date Hours Work Log Summary Details
 12-30-2014
0.5
Riveting Elevator Top Skin
Details
       

 12-30-2014
0.5
Prep Elevator For Final Assembly
Details
       

 12-30-2014
0.3
Elevator Trim Tab Final Assembly
Details
       

 12-30-2014
0.5
Elevator Top Skin
Details
       

 12-30-2014
0.5
Alodine Elevator Details
Details
       

 11-06-2011
20.0
Workshop Exterior Complete
Details
       

 10-29-2011
12.0
Frame Entry Way And Install Doors And Trim.
Details
       

 10-15-2011
12.0
Wall Sheeting Going Up
Details
       

 10-08-2011
12.0
Wall Sheeting South Side
Details
       

 10-02-2011
16.0
Finishing The Roof Sheeting
Details
       










Copyright © 2001-2018 Matronics. All Rights Reserved.