Dans RV8

Builder:
Dan Beadle
Location:
Incline Village, NV - USA
Aircraft:
VANS - RV8 N14DB
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO390
Prop:
AeroComposites
Total Build Time:
1174 Hours

Welcome to my RV8 project.

Dan Beadle is an ATP with CFI ratings. I have flown a lot of airplanes from taildragger's to medium twins. The RV8 is to be the sports car to get back to the basics of flying. I also have designed engine monitors for JP Instruments for many years. My focus is having an airplane to test new avionics concepts. As such, this aircraft will never be "done".

July, 2018
I went off to Oshkosh, WI, for AirVenture with a specific goal to look at as many RV engine installations as possible to learn how others have done them. After three days of looking at both ugly ducklings and at princesses, I got the message: just do it. The key is safety and finishing.

I am back in the hanger working. I have already had some early successes. I have a detailed task list for completion of the engine compartment. Now, it is just doing the tasks.


Recent Activity
 Date Hours Work Log Summary Details
 06-12-2019
0.5
Installing Hoses
Details
     

 06-12-2019
0.5
Cabin Heat Muff And Routing
Details

 06-12-2019
1.0
Alternate Air
Details
       

 06-11-2019
1.5
Completing Battery Box
Details
       

 06-11-2019
3.0
Aux Air
Details

 06-09-2019
2.5
Building Aux Battery Compartment
Details
       

 06-08-2019
3.0
Opening Up The Hanger After A Long Winter
Details
     

 06-08-2019
1.0
Build Compartment For Aux Battery And EDM DAU
Details

 09-25-2018
2.0
Prop Bracket
Details
       

 09-25-2018
2.0
Engine Progress Inspection
Details