KitLog pro

Powered By Kitlog Pro v2.0

Dans RV8
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-28-2019
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Riveting the Baffle Seals

It was Cameron's last day at the airport (at least for a while), so I decided to take him flying. I first had to get my self current with airwork and landings. Landings were great with winds of 15G20. It's like riding a bike.

When we got back, it was a short day. Cameron used pop rivets and 1/2" washers to secure the baffles.

We put the cowling back on and did a final check with the boroscope - great fit inside.

We started "permanently" attatching accessories, like the Oil Cooler.
' style=

Right Aft Corner

Right Aft Corner

' style=

Aft

Aft

' style=

Left Front Corner Intake

Left Front Corner Intake

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.