Date |
Hours |
Work Log Summary
 |
Details
 |
09-09-2021
|
2.0
|
Wired Fuel Flow 3 Wire And Connectors
|
|
  |
|
08-06-2021
|
4.0
|
Adding Spade Connectors And 27K Resiters Starter S
|
|
 |
|
08-05-2021
|
4.0
|
Master /starter SoleoidK-1,P-3, P-1
|
|
  |
|
08-04-2021
|
5.0
|
Installed Wires For VAL/Com
|
|
  |
|
08-03-2021
|
4.0
|
Wiring Master Relay And Starter Ignetion Switch
|
|
  |
|
08-02-2021
|
6.0
|
Drilled Hole's For EIS And Other Devices In Forwal
|
|
  |
|
08-01-2021
|
5.0
|
Work On Val/-Com And Val/Nav, GTR-200
|
|
  |
|
07-20-2021
|
4.0
|
J-3 L Mag And J-4 R Mag To Starter Switch
|
|
  |
|
07-01-2021
|
4.0
|
Wiring Of Altenator And Mag
|
|
|
|
06-30-2021
|
3.0
|
Work On Mag L/R Wiring
|
Details
|
  |