KitLog pro

Powered By Kitlog Pro v2.0

Pauls Web Site

Builder:
Paul Poulsen
Location:
Lilydale, Vic - Australia
Aircraft:
Grega GN/1 - Aircamper
Engine:
TBA -
Prop:
Patroney - 60-38 - Constant Pitch
Total Build Time:
104 Hours

I bought this project as a collection of parts from a local builder who imported it from the US. As is usual with any project, the more I looked into things the more I found that requires repair or replacement. This is the nature of things and part of the process and the fun.
I estimate that I still have some time to go. But, I am working through the systems replacing and refurbishing components as I go. Provided I do not get too fussy she may be flying by Christmas...which year is another matter :)

Recent Activity
 Date Hours Work Log Summary Details
 01-27-2020
8.0
Wing Construction Jig
Details

 11-10-2019
1.5
Made Up Aand Secured Side Mount Brackets
Details
       

 10-28-2019
1.5
Landing Gear Attachment Brackets
Details

 10-26-2019
1.5
De Burring
Details

 10-23-2019
2.0
De Burring And Cleaning
Details
       

 10-20-2019
3.0
Painting Metal Parts
Details

 10-09-2019
2.0
Removing Parts For Cleaning
Details
       

 10-08-2019
2.0
Disassembly
Details
       

 04-09-2016
3.5
Initial Visit
Details

 03-28-2016
2.5
Fixing Mstr Brake Cly Mounts In Place
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.