Powered By Kitlog Pro v2.0
Alaskan Bearhawk
Bearhawk
Empennage
1-24-2013
< Previous Log Entry
Next Log Entry >
Date:
1-24-2013
Number of Hours:
2.00
Manual Reference:
Brief Description:
Elevator Tubing Pt.1
Today I fiddled around with the elevator tubing. Using my aluminum bending block, I bent the T6 tips. Whoever said that bending .049 4130N tubing cold was harder than chinese arithmetic was right. It is some tough stuff! But, it's done.
Elevator tips
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
1409
4384
Avionics
23
61
Electrical
29
80
Empennage
167
416
Engine
141
499
Fabric
67
187
Flight Controls
57
148
Floats
31
125
Fuel System
29
87
Fuselage
380
1150
Hardware
4
16
Instruments
26
80
Interior
94
280
Miscellaneous
10
64
Paint
131
518
Prop
1
1
Tools
26
107
Welding
5
13
Wheels/Landing Gear
50
114
Wheels/Landing Gear/
50
114
Wings
88
324
Copyright © 2001-2024 Matronics. All Rights Reserved.