Finally getting back in shop after a long period. Spent several days figuring out where I left off and where I needed to start next. Decided the next step would be to prepare the bottom wing skins. I also received the Safeair pitot mounting mast and the Dynon Pitot/AOA tube from Aircraft Spruce. I started by removing the blue protective plastic along the area where the rivets will go. Next I temporarily attached the skin to the wing, match drilled the holes, moved the cleco's and match drilled the remaining holes.