KitLog pro

Powered By Kitlog Pro v2.0

Waynes Bearhawks
' style=
Date:  5-23-2012
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Finished rudder

I added the T1 tubing then dismantled the rudder for cleaning. With everything clean and ready for welding I reassembled the rudder in the jig and tack welded. With everything tacked I took it out of the jig for welding. It needed a little tweaking after welding. As with the elevators the "shark fin" needed tweaking.

Once the rudder was all welded and tweaked I welded the rudder horn in place. The last thing I did was add a light mount to the trailing edge.

I need more room in the shop to assemble the tail on the fuselage so I took the jig table out and rearranged the other tables.
' style=

Ready To Tack

Ready To Tack

' style=

Welding Rudder Horn

Welding Rudder Horn

' style=

Rudder Done

Rudder Done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.