I cut another oak rib forming blank for the shorter rib. Then I made the 3 big ribs. I cut the trailing edge section at the trim tap and made the parts for the trim tab. I made the hinges for the trim tab and welded the parts together. I assembled everything and added the remaining T1 tubing.
The left elevator is ready to be disassembled and cleaned and prepared for welding.