KitLog pro

Powered By Kitlog Pro v2.0

Waynes Bearhawks
' style=
Date:  10-3-2006
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Flange little ribs lightening holes

I was hoping to put a full day in but some other things came up as often does.

I flanged the lightening holes on the rest of the little ribs. These were kind of fun and went pretty quickly. Very little bob stick work was required. I later flanged all the tabs on the aileron nose, pocket and flap pocket ribs.

After home work Andrea came out and drilled the 3/4 inch hole in the aileron nose ribs.

All that is left of ribs to do is the 2 big ones. With any luck I'll have the ceremonial group photo of all 170 ribs tomorrow.

NOTE: I later discovered that the aileron pocket rib did not fit exactly to the rear spar. It was 3/32" too short. In hind sight it might be a good idea to wait to bend the small tab at the bottom later to match the rear spar.
' style=

Flap and Aileron Ribs are Done

Flap and Aileron Ribs are Done

' style=

Aileron Nose Rib in Flange Block

Aileron Nose Rib in Flange Block

' style=

Drilling the 3/4 Inch Hole in Aileron Nose Rib

Drilling the 3/4 Inch Hole in Aileron Nose Rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.