8/2 1 Cut and buffed rudder 8/3 2 Finished rudder buffing Started sanding fuselage w/1000 8/4 1 More wet sanding 8/5 1 More of the same 8/9 1.5 Same 8/11 3 Same 8/12 3 Same 8/13 1.5 More clearcoat sanding w/1000 8/18 6 Finished with 1000 grit 60% done with 1500 grit 8/22 3 Finished 1500 25% done w/2000 8/23 6 Finished 2000 30% done with 3000 8/24 6 Finished 3000 grit Started buffing 8/25 3 Finished step 1 of buffing 8/27 3 Finished step 2/3 of buffing Installed rudder Sanded top cowling to 2000 8/28 4 Finished top cowling Finished lower cowling paint repair Installed speedbrake Installed OAT sensor Ran engine, new tachometer setup works. Idle cutoff not working. 8/29 2 Prepped spinner for paint Fabricated hinge pin retainer for cowling 8/30 4 Installed camloc retainers Finished hardware on control stick Installed battery strap Removed voltage regulator in prep for new one Primed spinner and trim tab Bled brakes Worked on seat/stick clearance