3/11 1 Cowling work 3/17 4 Filled cowling area with liquid foam Sanded to shape Glassed repair area 3/18 1.5 Cut and removed cowl Started removing foam to glass inner layer 4/9 2 Removed foam and added two layers inside 4/17 3 worked on inlets 4/27 2 floxed inlets