Additional on the floor panels. One problem is "starting and stopping" is keeping in the grove of getting the project done. Still a productive weekend of it. Slight mistake, floor up near flap handle should be slightly overlapped, with a "gap plate". I had made both right and left symetrical. So I really need TWO gaps plates. Minor issue, but should have caught it earlier.