KitLog pro

Powered By Kitlog Pro v2.0

Traci and Tom's RV-7A
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-11-2013
Number of Hours:  2.00
Manual Reference:  DWG 5
Brief Description:  Priming...and starting the rudder.

The never ending task for spraying primer on the parts continues. While that was drying, I moved ahead to the next set of plans - the elevator!
Just like the rudder, you need to cut out all the stiffeners to the right size and match them with the holes. The plans warn that the tricky elevator is the left side since it has the trim tab and the hinge, so they start you with the eaiser right side.
It's good to have both plans out as a reference since you need to cut some of the stiffeners to a specific length and if you have a drawing to study, it's easier to see what you are dealing with. More in the next entry on that.
' style=

Thumbs up for completed primed parts.

Thumbs up for completed primed parts.

' style=

The right elevator plans are up now.

The right elevator plans are up now.

' style=

Cutting and matching the elevator stiffeners.

Cutting and matching the elevator stiffeners.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.