Powered By Kitlog Pro v2.0
Build Log
RV-9
All
4-26-2011
< Previous Log Entry
Next Log Entry >
Date:
4-26-2011
Number of Hours:
2.00
Manual Reference:
DWG 4; Manual 6-6
Brief Description:
Drilled and deburred elevator piano hinge
Positioned and drilled the elevator side of the piano hinge. Deburred the holes.
Next: Drilling the trailing edge wedge.
Drilled piano hinge on elevator
Close-up of elevator piano hinge
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-9 Home
Category
# Logs
# Hours
All
307
872
Canopy
8
20
Empennage
98
284
Fuselage
136
386
Miscellaneous
1
3
Wings
64
179
Copyright © 2001-2024 Matronics. All Rights Reserved.