KitLog pro

Powered By Kitlog Pro v2.0

Tims Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  12-1-2014
Number of Hours:  8.50
Manual Reference:  
Brief Description:  vertical stabalizer

Started a picture library after inventory an general edging, straightening, getting supplies together to alodine parts for corosion control.First set of pictures begin with vertical stab frame. 3rd picture is some parts for the horizontal stab prepared thru alodine an primer. I'm chosing to use Sherwin Williams wash primer. p60-g2. I beleive it is the same primer Vans uses on the Quick build Wings an Fuselage. I am going from this point on with this primer, also use the Alumi-prep after scotch brite treatment. At this time, ive decided to shelf the verticle stabaizer an start on the horizontal instead. Total accumulated hours to this point, 8.5 hours
' style=

front spar an ribs

front spar an ribs

' style=

same parts alodined

same parts alodined

' style=

parts for horizontal alodined an primed

parts for horizontal alodined an primed

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.