KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  9-16-2012
Number of Hours:  2.00
Manual Reference:  N/A
Brief Description:  Page 75 Installing the Stow-n-Go Hatch Part 4

September 16 2012

MODIFICATION NUMBER 11

Installing the Stow-n-Go Hatch Part 4

Filled low spots and rivet holes with Bondo and sanded smooth.
' style=

Filled low spots with Bondo

Filled low spots with Bondo

' style=

Sanded smooth.

Sanded smooth.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.