KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  9-10-2012
Number of Hours:  2.00
Manual Reference:  S17- 1.1 to 4.3
Brief Description:  Page 69 Temporarily installed Turtle Deck

September 11 2012 Continued.

Section 17. Temporarily installed Turtle Deck

Manual Ref: S17- 1.1 to 4.3

I decided to temporarily install the Turtle Deck because I am going to install the Recreational Mobility Stow-n-Go Rear Cabin Window Hatch Kit. http://seareyspecialist.com/product_info.php?products_id=167&osCsid=168edbaa5b6d1649938f9c0ddc375ff3
It is supposed to be installed after the Turtle Deck was installed but I did not want to have to mess up the carpet that is supposed to be installed in the Turtle Deck before installation. In fact I am going make all the cuts and repairs in the fiberglass and install the Stow-n-Go Rear Cabin Windows before the carpeting.

I set the Turtle Deck and strapped it down and drilled the first hole in the rear, I then cleco the Rivet Spacer and drilled the 2nd hole at 1 inch and cleco the Rivet Spacer to the 2nd hole which set the rest of the holes at 1 inch and drilled the rest of the 18 holes in the Spacer. I continued till I got the left side done then started on the right side.
' style=

Temporarily installed Turtle Deck

Temporarily installed Turtle Deck

' style=

Used a 20 Hole Rivet Spacer

Used a 20 Hole Rivet Spacer

' style=

All at 1 inch distance and in a straight line

All at 1 inch distance and in a straight line

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.