KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  9-6-2012
Number of Hours:  0.50
Manual Reference:  N/A
Brief Description:  Page 65 Brake Line Routing Part 3

September 10 2012 Continued.

Brake Line Routing Part 3

After both sides were done, I ran the Gear up and down to see how much slack I needed to keep from pulling the tubes and cut the extra. I temporally attached the Tee
' style=

Tubes out the end of the Gear Leg

Tubes out the end of the Gear Leg

' style=

Both Tubes connected to the Tee

Both Tubes connected to the Tee

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.