Powered By Kitlog Pro v2.0
Steves Web Site
SparrowHawk I
All
10-8-2009
< Previous Log Entry
Next Log Entry >
Date:
10-8-2009
Number of Hours:
2.50
Manual Reference:
Brief Description:
Fuel Level Sensor and Battery Tie Down
I prepared the battery Tie Down for paint. Cleaned with MEK and sprayed with etch primer. Then applied a coat of black paint.
I cut two lengths of clear tubing for the battery tie down rods hoping this will help the corrosion control.
I installed the fuel quantity sensor using ProSeal and 10-32 SS bolts. I did not install the assembly until I can do an electrical check.
Fuel Quantity Sensor -inside
Fuel Quantity Sensor -outside
Battery Tie Down holder
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SparrowHawk I Home
Category
# Logs
# Hours
All
261
784
Avionics
19
42
Cabin
29
118
Controls
33
129
Electrical
44
131
Empennage
30
94
Engine
36
104
Exhaust
2
4
Fuel System
17
34
Fuselage
1
Heater
1
3
Miscellaneous
27
84
None
1
0
Prop
3
4
Rotor Head
5
8
Tools
1
1
Wheels
5
10
Wings
7
18
Copyright © 2001-2024 Matronics. All Rights Reserved.