Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Avionics
4-26-2013
< Previous Log Entry
Next Log Entry >
Date:
4-26-2013
Number of Hours:
2.50
Manual Reference:
Brief Description:
Wire routing continues
Contiuned working on wiring up Flap Postioning system. Enlarged the tunnel transition hole on right side to 3/4" to run trim cable forward and then replaced the existing wire that was removed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.