KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  8-24-2012
Number of Hours:  2.50
Manual Reference:  Aerosport
Brief Description:  More interior panels

Finished drillling left pax panel lower attach hole. Meets up with existing hole. Upper hole drilled and ready for nut plate.

Drilled right pax panel for attach points. Installed two K1000-6 nutplates on aft door pillar.
Trimmed panel for mating with carge panel. Drilled attach holes and ready for nutplates.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.