KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  1-21-2011
Number of Hours:  2.00
Manual Reference:  33-3+4
Brief Description:  More Baggage Area work

Final drilled, deburred and dimpled the F-10100b shim and F-1026 door seal channel then clecoed these parts in place. Match drilled #30 the two holes on the upper and lower tabs of the F-1026 door channel. Trimmed the F-1031 upper door channel per plans and then clecoed in place.
Then clecoed the F-1027 close out panel in place and match drilled #30 all holes on the close out panel and upper door channel.

Separated both F-1022 baggage floor stiffeners into their individual sections. Disassembled all parts used in this section. Clecoed stiffeners to bottom of baggage floors and match drilled #40. Final drilled #40 the holes along the aft end of the baggage floors. Final drilled #30 the remaining holes in the baggage floors.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.