KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  7-6-2014
Number of Hours:  5.00
Manual Reference:  44-6,9,10,11
Brief Description:  Tank nutplates and final mate prep work

Finished riveting left wingwalk fairing supports.

Drilled left wire penetration holes.

Removed all interior that had been test fit until ready for final installation.

Pulled fuel tanks. The left forward torque tube assembly is frozen in the fuel tank bearing-????
Need to fix. A hammer wouldn't budge it.

Rerouted the Dynon AOA line so it wouldn't rub on the wing spar on its way into the fuselage.

Drilled, deburred and dimpled the remaining fuel tank nutplates. Riveted as many as I had on hand but it wasn't enough. Hello ACS. I would have just walked there but it is Sunday.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.