Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Wings
7-12-2010
< Previous Log Entry
Next Log Entry >
Date:
7-12-2010
Number of Hours:
1.50
Manual Reference:
21,22,23
Brief Description:
Installed Flaps and Ailerons, Actuators finsihed
Installed all flaps and ailerons with correct hardware- Final torque done after wing installation
Match drilled both torque tube assemblies
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.