Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
11-4-2008
< Previous Log Entry
Next Log Entry >
Date:
11-4-2008
Number of Hours:
1.50
Manual Reference:
11-9 and 12-2
Brief Description:
Elevator trim assembly and Fairing rough cuts.
11-9
Step 3 to 6 Temp. assembled elevator servo and cable assembly. Missing several washers.
Remainder of Section 11 deferred until final installation.
12-1
Step 1 Checked and filed as necessary all tip fairings to remove left over material in groove.
Step 2 Rough cut all fairings to fit locations.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.