Brief Description: Pushrod adjustment and trim servo mount assembly
11-6
Step 5 Installed pushrod. Step 6 Checked for full range of travel and filed up/down stops as required to attain full travel
11-7
Step 1-3 Clamped elevators in trail. Transfered template to carboard. Checked for proper deflection and then tightened jam nuts. Step 4 Unclamped elevators and checked for interference.
11-8
Step 8 Riveted trim bellcrank brackets, trim servo spacer, trim cable anchor brackets, and nutplates to trim servo mount bracket.